MBTA – Heavy Rail ACSES II Positive Train Control
Scope: Provided and Installed an Integrated ACSES II‐based Positive Train Control System Compliant with 49 CFR 236 80 Diesel
MTA – Light Rail
1 Comment
Scope: Communication System Upgrade and Implementation 53 Light Rail Vehicles 2 Maintenance Yard Facilities Communications System Solution Passenger Information System
MTA – Heavy Rail Automatic Train Control
Scope: Data Communication System and Wireless Communication System Design 40 Married Pairs 15.6 Miles of Track Wayside Wireless Network Design for Communication Based